Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Male, 57 years, born on 24 May 1966

Болниси, willing to relocate, prepared for business trips

Mining engineer

5 000  in hand

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, flexible schedule, remote working, rotation based work

Work experience 33 years 4 months

June 2012currently
11 years 11 months
Geo-Logaritmica

Georgia, www.geo-logaritmica.com

Mining Industry... Show more

Manager
Computer aided services in mining/geology, geodesy/survey, geostatistics, construction and architectural engineering. Geological, geo-technical, and survey data collection and interpretation, geo-statistical study, resource estimation, reserves calculation and mine planning at Tukhmanuk gold deposit, Armenia, the property of Global Gold Corporation.
April 2011April 2012
1 year 1 month
Datamine International

www.dataminesoftware.com/

Mining Industry... Show more

Branch manager
CAE Mining (DATAMINE INTERNATIONAL) www.cae.com/presence-mondiale/cae-datamine-international-limited-kazakhstan/ April 2011 – April 2012 (1 year 1 month) Karaganda, Kazakhstan Wells, Somerset, the UK: Sungun copper mine (Iran) short and long term mine planning using Datamine Studio 3 and ISTS (interactive Short Time Scheduler) software. Personally trained 5 groups of geologists and mining engineers in data collection/interpretation and geological & resource modeling, open-pit and underground engineering techniques using Datamine Studio 3 software, consulted clients in geological and mining tasks, Kazakmys LLC being the major client in Kazakhstan. Mentoring program in Datamine Studio 3 included: Import / Export: Cleaning of Data; Basic Statistics on Data; Drillholes; Formating; Legends; Plotting. Geological Modelling: String Tools; Section Correlation; Wireframes; Wireframe Volumes; Boolean Operations. Resource Modelling: Block Modelling; Statistics; Basic Estimation; Reserves and Charting. Advanced Modelling: Dynamic Anisotropy; Unfold; Geostatistics (Concepts & Software). Open-Pit Design: String tools; Toe&Crest&Ramp design; Contour design. NPV Sceduler: Importing Data, Generating Economic Model, Optimizing the Pit, Generating Pushbacks
March 2010January 2011
11 months
Borun Group

Tbilisi, borun.ge/

Mining Industry... Show more

Mining and Survey Project Manager
Reconstruction of old industrial premises to meet the needs of the company profile – construction and earth moving fleet repair stations and workshops. Project management and control over road construction. Construction survey group training in using Total Station, LisCAD and AutoCAD software techniques, control over survey field works in road construction. Coal deposit data collection/interpretation, reserve modeling and planning, geostatistical studies on coal seams using Datamine Studio3 software (Tkibuli Coal Mine, West Georgia). The deposit operates since sixties of 19th century, having been opened under the Russian Emperor’s decree. Geological and engineering data was presented in the forms of core drill logs, handmade drawings of horizontal and vertical sections. The log data was transferred into spreadsheets, checked for consistency using histograms and scatter plots. There were 18 coal seams in the deposit measuring 11 by 5 km in size, for every single seam I had built a roof and floor triangulated networks and checked for intersections between floor and roof for an individual seam as well as for over- or underlaying seams. Each seam with geometry, controlled by numerous tectonic faults, was filled in with virtual blocks using dynamic anisotropy method developed at Datamine International, and populated with up to 12 elements, such as heat content, ash content, porosity, etc.
July 2006March 2010
3 years 9 months
Madneuli JSC

Georgia, www.richmetalsgroup.com/

Mining Industry... Show more

Open-Pit Mine Superintendent
Long&short term mine planning, reserves estimation, geological modeling, pit optimization using Datamine Studio 3 and NPV Scheduler. Under my supervision geological, geo-technical, survey end engineering data for Madneuli Copper-Gold deposit was collected and interpreted in the form of 3D wireframe models and spreadsheets, based on which Snowden Group had made a resource estimation and reserve modeling for the deposit. Since then I had been doing long and short term (30 days) mine plans starting from 2006 up to Jan 2013. I had also made a resource estimation, reserves modeling and mine planning for Balichi Copper-Gold Deposit and Sakdrisi Gold Deposit, both located near Madneuli.
March 2006August 2006
6 months
Deno Gold

Armenia, www.dundeeprecious.com/operations/producing-mines/kapan/default.aspx

Mining Industry... Show more

External Consultant
Contracted Surveyor at Deno Gold Mining in Armenia. Worked as acting Chief Surveyor at underground gold-copper mine. Duties and responsibilities included training staff in surveying practices using Leica Total Station, assisting in technical software applications for mining, planning, geology and other related activities; teaching trainees techniques for AutoCAD; setting up the new personal structure of the survey group. I’d surveyed existing underground mine using Leica Total Station and made a 3d drawings using LisCAD software. I’d surveyed tailings dam and surrounding terrain, producing contour line drawings and 3d wireframes.
January 2001March 2006
5 years 3 months
Madneuli JSC

Georgia, www.richmetalsgroup.com/

Mining Industry... Show more

LisCAD Coordinator
Duties included managing the survey& mining engineering department, Chief Surveyor reporting to me. I had set up survey procedures at the open-pit using Total Station and LisCAD software – daily survey of blast holes, mapping, stakeout, etc; month end survey of mined area, digital terrain modeling, calculating volumes between the surfaces as an alternative volume&tonnage control of the material moved to crusher bin, low grade ore stockpile, waste dump and ore stockyard. Duties also included implementation of truck load and movement monitoring system, earthmoving machinery performance calculation, network diagram and operations schedule for drilling and blasting works, drill rig performance monitoring (optimal rotation speed, drill bit penetration rate in various rock types, etc).
January 1998January 2000
2 years 1 month
Quartzite Ltd

Georgia, www.richmetalsgroup.com/

Mining Industry... Show more

Site Construction Engineer / Inventory & Purchasing Coordinator
Stores and Supplies control using Mainpac The Asset Maintenance System Software. I set up stores for the company, organizing both bin locations and maintaining regular stocktake. Materials and spare part issues was immediately recorded in the computerized system, which made it possible to control critical amount of spare parts based on a minimum number in a store bin to release purchase orders in time. The system controlled due time for diesel generator, pump motor, machinery engine replacement parts, operation of which was monitored by dedicated spotters, bringing their records to my office daily Heap Leach Pad construction supervisor, structural and mechanical designs – ADR columns, reinforced concrete vats, maintenance workshop and AD plant concrete base; company residential house (drawings, expenses, materials supply, accounting, construction crew timing, salary calculation, etc. Oral and written translations.
January 1992January 1998
6 years 1 month
Madneuli JSC

Georgia, www.richmetalsgroup.com/

Mining Industry... Show more

Graphic designer
Constructional and architectural drawings for industrial and residential buildings; structural analyses for building elements; equipment mechanical parts design and structural analyses.
October 1984November 1986
2 years 2 months
USSR Army

Estonia

Land Surveyor
Land surveying, mapping; contol points survey check for intercontinental missile alignment; determination of true azimuth through using gyro-theodolite GI-B2 MOM.

Key skills

You can change skill levels in the mobile app — the website will have this feature a little later on

AutoCAD, LisCAD, Datamine Studio 3, Civil CAD
MS Office

About me

Playing boogie woogie and blues piano.

Higher education (master)

1991
Georgian Technical University
Civil / Structural Engineering, ARCHITECTURE AND CIVIL ENGINEERING

Languages

RussianNative


EnglishC2 — Proficiency


Citizenship, travel time to work

Citizenship: Georgia

Permission to work: Georgia

Desired travel time to work: Doesn't matter